PROJECT OVERVIEW:
We built a new metal building to house 2 rotary ups systems and 1- large electrical control cabinet to control the power system for the labs at Brammer Bio Thermofisher Labs.

This project involved coordinating work times around the lab space and the lab schedule. It was a fast-tracked project that required a lot of upfront ordering and coordination to ensure the project started and completed during a certain duration.